Precise bills of quantities, cost plans, and master project schedules — eliminating financial uncertainty and establishing a clear baseline for project control from day one.
Planning and BOQ services form the commercial and scheduling backbone of any construction project. A well-prepared Bill of Quantities eliminates ambiguity in tendering, ensures fair contractor pricing, and provides a clear cost control framework throughout construction.
Combined with a detailed Primavera master schedule, our planning service gives clients, contractors, and consultants a single authoritative reference for time and cost — from tender through to final account.
Detailed measurement and item descriptions to NRM2 standard — covering all trades, materials, and preliminaries.
Fully logic-linked Primavera P6 programme with critical path, milestones, and resource loading.
Monthly cost reports, variation tracking, and final account preparation to keep projects financially on track.
From drawing issue through to tender-ready documentation — a disciplined, traceable workflow.
All architectural, structural, and MEP drawings reviewed for completeness and coordination before measurement begins.
Systematic quantity take-off from drawings — all elements measured, categorised, and recorded with full traceability to drawing references.
Measured quantities formatted into a full priced BOQ with item descriptions, units, and preliminary sections to NRM2 or FIDIC standard.
Primavera P6 master schedule developed with full activity logic, resource allocation, and critical path identification.
S-curve and monthly cash flow projections developed from the BOQ and programme — aligned with contract payment milestones.
Complete tender documentation package compiled and issued — BOQ, programme, specs, and contract conditions ready for contractor submission.
Complete priced or unpriced BOQ in Excel and PDF — all trades, MEP, and preliminaries covered.
Early-stage cost plan benchmarked against current Gulf market rates — suitable for client budgeting and financing.
Fully logic-linked master schedule in P6 XER format with critical path, milestones, and WBS structure.
Monthly and cumulative S-curve projections aligned with programme and payment milestone schedule.
Full tender package including instructions to tenderers, contract conditions, and technical specifications.
Monthly cost and schedule progress reports during construction — earned value analysis and variance tracking.
Industry-standard project scheduling software for large and complex construction programmes.
Digital takeoff and estimating software — precise quantity measurement directly from PDF and BIM drawings.
Programme tracking and reporting for projects not requiring full P6 deployment.
Custom cost control dashboards, BOQ pricing models, and earned value reporting tools.
A 3-level retail development requiring a full tender BOQ across all civil, architectural, structural, and MEP works — plus a Primavera P6 master programme for a 24-month construction period with phased handover.
Planning and BOQ work best when aligned with design and project management.
Programme and BOQ used as the live baseline for site supervision and contract administration.
Quantities extracted directly from the BIM model for greater accuracy and speed.
Design drawings form the primary source for BOQ measurement and specification writing.
Share your drawings and we'll provide a scope, timeline, and fee proposal within 48 hours.